MnDOT Hastings Bridge Project
Upper River Services partnered with Lunda/Ames JV to design and implement a process to move the pre-constructed, 6.5 million pound, Hastings bridge from land to barge. Upper River then positioned the bridge to be lifted and placed 50’ above the river.